PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing Elev. 1,2,3 guide rails at the 4th floor Facing South.jpg Installing Emergency Night lighting split wire at the 3rd floor Facing East.jpg Installing exterior framing at the 4th floor Facing North.jpg Installing sprinkler branches at the 4th floor Facing West.jpg Installing Emergency Night lighting split wire at the 3rd floor Facing East (2).jpg
Previous page Installing Emergency Night lighting split wire at the 3rd floor Facing East (2)
Installing Emergency Night lighting split wire at the 3rd floor Facing East (2)